Project
Price per Watt Benchmark ⓘ
Above marketGreat$3.30
Market$4.10
High$5.00+
Very high
Issue Matrix ⓘ
Price per watt vs. market ⓘ
Price per watt (USD)
Equipment Summary ⓘ
Incentives
Verify at filingInsurance Context ⓘ
CO fallbackWhat changes
Independent technical and financial review. Not legal, tax, or engineering advice.
IRR NPV Model ⓘ
Sensitivity Grid
NPV (6% discount rate baseline shown)
Dealer Fee — What This Means
WatchYour contract price includes a dealer fee to cover sales, financing, and overhead. Cash-equivalent $28,500 → Contract price $34,100 → implied dealer fee $7,700.
Ask your installer whether this fee can be reduced or eliminated with a cash purchase.
Nominal vs. NPV
Why we discount future savings
A dollar saved in the future is worth less today. We discount future cash flows at 6% to reflect the time value of money and investment risk.
Nominal savings vs. NPV savings
Nominal savings are total dollars saved. NPV savings are those dollars in today’s terms, so they are useful for comparing options fairly.
How we got from installer claim to modeled savings
System & Equipment
Contract
Workmanship warranty
Warranty detail is strongest when proposal and contract language are both uploaded.
Interconnection & timeline
Utility: —
Colorado residential interconnection typically runs 4-12 weeks depending on utility queue and system size.